Home / News / Good News: The Sewage Treatment Project of Damaoping in Sanchang, Zhangshi City, Hunan Province Has Been Successfully Accepted

Good News: The Sewage Treatment Project of Damaoping in Sanchang, Zhangshi City, Hunan Province Has Been Successfully Accepted

Views: 0     Author: Site Editor     Publish Time: 2026-01-04      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

On July 30th, Shenglong Environmental Protection, in collaboration with Guiyang Qinshan Agricultural and Animal Husbandry Technology Co., LTD. (Party A), organized an on-site acceptance inspection of the "Zhangshi Sanchang Damaoping Sewage Treatment Project" in Chenzhou, Hunan Province. General Manager Lin Shigui and Manager Qiu Zhenzhan of the Commissioning Department of our company attended the acceptance inspection.

Take it step by step and run the "Shenglong Speed"


The project signed a contract in October 2023 and was originally scheduled to start construction in April 2024. However, the weather was unfavorable. From April to May, multiple rounds of rainfall overlapped, and even extreme weather conditions such as strong convective weather occurred. The rainy period lasted nearly 50 days, which brought great resistance to the on-site construction and several delays in the project schedule.


After the weather improved, Shenglong Environmental Protection, in order to optimize the construction process and enhance work efficiency, closely cooperated with its competitors through cross-construction. It led all the personnel from the participating construction departments into a steady and aggressive rush work state, tackling each item one by one from aspects such as equipment list, technical requirements, quality standards, delivery plans, and equipment installation.

By the time the joint completion acceptance by Party A was completed, it only took 52 days, achieving the production goal of "zero accidents" in safety and "high standards" in quality, and running the "Shenglong Speed" of important project construction.

Next, Shenglong Environmental Protection will always maintain a state of "full bow and tight string", continue to carry forward the spirit of facing difficulties head-on and working continuously, solidify safety and quality responsibilities, accelerate the progress of other environmental protection construction projects, fully cooperate with the enterprise's production and operation plans, and strive to put them into operation as soon as possible.

We will also take the successful acceptance of this key project as an opportunity to continuously respond to the government's call for "green development", support high-quality development with high-quality ecological projects, provide a win-win one-stop service of "cost reduction and efficiency improvement, quality enhancement and efficiency improvement" for the transformation of the production environment, and contribute more wisdom and strength to accelerating the realization of self-reliance and self-strengthening in green and low-carbon technology.

HAVE ANY QUESTIONS?
CONTACT US FOR ASSISTANCE.
It is a comprehensive environmental protection technology company integrating environmental protection consultation, research and development, design, equipment production, sales, construction and operation.

QUICK LINKS

PRODUCTS CATEGORY

CONTACT US

Telephone: +86-13556783664
 WhatsApp: +8615521201645
 QQ: 1050195160
Email: meila@dgslong.com
 Address: Wanjiang District, Dongguan City, Guangdong Province
Copyright © 2026 Dongguan Shenglong Environmental Protection Technology Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy